Types of brick bonding
Contents |
[edit] What is brick bonding?
Brick bonding is the pattern in which bricks are arranged in a structure such as a wall or column.
Very broadly, bricks can be laid as soldiers (standing upright), stretchers (laid lengthwise along the wall) or headers (laid width wise along the wall).
Bricks are typically laid to an offset pattern to maintain an adequate lap between joints from one course to the next and to ensure that vertical joints are not positioned above one another on consecutive courses.
[edit] What is the objective of brick bonding patterns?
- Distribute loads throughout the structure to achieve maximum strength.
- Ensure stability.
- Achieve the desired aesthetic.
There are a great number of brick bonding patterns available. Factors affecting the selection of a brick bonding pattern include; the strength that is required, the thickness of the structure, the part of the structure (for example, a course of bricks over a window might have a different bonding pattern) the aesthetic requirement, the type and size of brick being used, local tradition and so on.
[edit] Types of brick bonding patterns
A number of commonly used brick bonding patterns are described below.
[edit] Stretcher bond
Stretcher bond is the most commonly used brick bond pattern in the UK. It is formed using only stretchers (bricks laid lengthwise), with the joins on each course centred above and below by half a brick. This type of bonding is not particularly strong.
A variation is the raking stretcher bond. The overlap between bricks is usually a third or a quarter of a brick, instead of half a brick.
[edit] English bond
English bond is a pattern formed by laying alternate courses of stretchers and headers. The joins between the stretchers are centred on the headers in the course below. This is one of the strongest bonds but requires more facing bricks than other bonds.
[edit] English garden wall
English garden wall bond is similar to the English bond but with one course of headers for every three courses of stretcher. The headers are centred on the headers in course below. This gives quick lateral spread of load and uses fewer facings than an English bond.
[edit] English cross bond
English cross bond alternates courses of stretchers and headers, with the alternating stretcher course being offset by half a brick. The stretchers are centred on the joins between the stretchers below them, so that the alternating stretcher courses are aligned. Staggering stretchers enables patterns to be picked out in different texture or coloured bricks.
[edit] Flemish bond
The Flemish bond is formed by laying headers and stretchers alternately in each course. The headers of each course are centred on the stretchers of the course below. This bond is strong and often used for walls which are two-bricks thick.
[edit] Flemish garden wall (also called Sussex bond)
The Flemish garden wall bond (or Sussex bond) is a variant of the Flemish bond, and uses one header to three stretchers in each course. The header is centred over the stretcher in the middle of a group of three in the course below.
[edit] Monk bond
The monk bond is a variant of the Flemish bond and involves two stretchers between the headers in each course. The headers are centred over the join between the two stretchers in the course below.
[edit] Header bond
The header bond features courses of headers offset by half a brick. It is similar to the stretcher bond but with headers instead of stretchers.
[edit] Stack bond
In stack bond, bricks are laid directly on top of one another with joins aligned, running vertically down the entire wall. Bricks can either be stacked horizontally or vertically.
The alignment of joints results in minimal bonding which means that this bond is weak and often structurally unsound unless wire bed-joint reinforcement is placed in every horizontal course or, where loading is moderate, every alternate course. This is often used purely for decorative purposes and in rain-screen applications.
[edit] Sussex bond
The Sussex bond is the same as the Flemish garden wall bond, and uses three stretchers and one header in each course.
[edit] Running bond
The 2018 International Residential Code (IRC), published by the International Code Council (ICC) defines running bond as: ‘The placement of masonry units such that head joints in successive courses are horizontally offset not less than one-quarter the unit length.’
Others might include facing bond, Dutch bond, raking bond, zigzag bond, diagonal bond, herringbone and herring bonds, monk bond, rat trap bond to mention a few.
[edit] Related articles on Designing Buildings
Featured articles and news
Plumbing and heating systems in schools
New apprentice pay rates coming into effect in the new year
Addressing the impact of recent national minimum wage changes.
EBSSA support for the new industry competence structure
The Engineering and Building Services Skills Authority, in working group 2.
Notes from BSRIA Sustainable Futures briefing
From carbon down to the all important customer: Redefining Retrofit for Net Zero Living.
Principal Designer: A New Opportunity for Architects
ACA launches a Principal Designer Register for architects.
A new government plan for housing and nature recovery
Exploring a new housing and infrastructure nature recovery framework.
Leveraging technology to enhance prospects for students
A case study on the significance of the Autodesk Revit certification.
Fundamental Review of Building Regulations Guidance
Announced during commons debate on the Grenfell Inquiry Phase 2 report.
CIAT responds to the updated National Planning Policy Framework
With key changes in the revised NPPF outlined.
Councils and communities highlighted for delivery of common-sense housing in planning overhaul
As government follows up with mandatory housing targets.
CIOB photographic competition final images revealed
Art of Building produces stunning images for another year.
HSE prosecutes company for putting workers at risk
Roofing company fined and its director sentenced.
Strategic restructure to transform industry competence
EBSSA becomes part of a new industry competence structure.
Major overhaul of planning committees proposed by government
Planning decisions set to be fast-tracked to tackle the housing crisis.
Industry Competence Steering Group restructure
ICSG transitions to the Industry Competence Committee (ICC) under the Building Safety Regulator (BSR).
Principal Contractor Competency Certification Scheme
CIOB PCCCS competence framework for Principal Contractors.
The CIAT Principal Designer register
Issues explained via a series of FAQs.
Comments
[edit] To make a comment about this article, click 'Add a comment' above. Separate your comments from any existing comments by inserting a horizontal line.